Biffa Cannock
Project Overview
New executive changing room at Biffa, Cannock AD Plant
Works Consisted Of
• Strip out old room back to bare shell
• Break out old Aco drain/re-concrete
• Power wash and de-grease walls & floor
• Block up wall to rec hall
• Install new wall paneling /decoration
• Install new non-slip poly vinyl floor
• New lighting/heating and door access system
• New ventilation installed
Project Duration
• 5-week project.
Project Value
• £30,000
































