ALLIANCE HEALTHCARE, BRUNSWICK
PROJECT OVERVIEW
LCM were instructed by Alliance Healthcare to set up a Cross-Dock Centre within recently acquired industrial units at Brunswick Industrial Estate. The works are to be conducted in 2 phases.
DESIGN FEATURES
- Changes and extension to the existing perimeter fence
- Additional flood lighting
- Additional car parking spaces
- Access control fire and security installation
- 2 new double deck trailer pods
- New fast acting environmental doors
- Refurbishment works, new offices & toilets
- Fire protection work
- Electrical installation
- Plumbing and gas pipework
- Access controlled gates

More Case Study Photos
































