13 & 14 Forth Street, Newcastle
Works Consisted Of
• New shop front to the right-hand arch to mirror image the left hand side
• Strengthening of mezzanine structure
• Overhaul of windows and doors to existing shop front
• Removal of signage
• Render repairs
• Cladding repairs and redecoration to all cladding
• Installation of stud wall to the WC
• Installation of new WC and WHB
• Decoration to handrails
• New distribution board and new electrical cupboard
• Replacement lighting to LED
Project Duration
• 9-week refurbishment project
• Completed mid-October 2023.